MCSE: Private Cloud Microsoft

Microsoft 70-981 New Questions, Latest Upload Microsoft 70-981 Certification Material Provider Sale

You can prepare for Microsoft 70-981 with little effort because Flydumps is now at your service to act as a guide in heCompTIAng you pass Microsoft 70-981 exam. Now get that necessary competitive edge that comes with preparing with the help of Flydumps.

Testlet 1
Topic 1, A.Datum

Overview

A. Datum Corporation is an accounting company that has 3,000 employees.
A. Datum has two main offices and five branch offices. The main offices are located in London and New York. The branch offices are located in Asia. All offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Existing Environment
Active Directory Environment
The network contains an Active Directory forest named adatum.com. The forest contains a single
domain. All domain controllers run Windows Server 2012.
Each office contains five domain controllers. Each office is configured as an Active Directory
site.

System Center 2012 Infrastructure
A. Datum has a System Center 2012 infrastructure that contains six servers. The servers are

System Center 2012 is used to maintain a private cloud named Cloud1. Cloud1 consists of 10 Hyper-V hosts in the London office. Cloud1 hosts the following applications:
A custom accounting application named App1. App1 consists of four virtual
machines. Two of the virtual machines have Microsoft SQL Server 2012 installed.
The other two virtual machines have the Web Server (IIS) server role installed.
App1 is deployed by using a service template.
A custom marketing application named App2. App2 consists of two virtual
machines. One virtual machine has SQL Server 2012 installed. The other virtual
machine has the Web Server (IIS) server role installed. App2 is deployed by using
virtual machine templates.
System Center 2012 Configuration Manager

Microsoft SharePoint Server 2010

Microsoft Exchange Server 2010

Microsoft Lync Server 2010
Problem Statements

The virtual machine template used to deploy web servers for App2 does not include the Network Load Balancing (NLB) feature. A. Datum plans to scale out App2 to use NLB.
Requirements
Business Goals

A. Datum plans to make App1 available to its customers by hosting the application in either A. Datum’s data center or in a Windows Azure public cloud named Cloud2.
A. Datum wants to minimize hardware and software purchasing costs, whenever possible.
Planned Changes

A. Datum plans to implement the following changes:
Implement Operations Manager.

To App1, add a server that has Microsoft BizTalk Server deployed.

Deploy a new instance of App1 to the New York office. The instance must comply
with the Sarbanes-Oxley Act.
Implement Configuration Manager and integrate Configuration Manager and VMM. Configuration Manager will be used to manage updates for the Hyper-V hosts.
Technical Requirements

A. Datum identifies the following technical requirements:
Create a runbook that will be used by Service Manager to create an instance of a
virtual machine. The virtual machine will be based on a virtual machine template
named VMT1. Users must be able to request the creation of instances of the
virtual machine from a self-service portal.
Ensure that the users in the sales department can use a self-service portal to
request that a new instance of App1 be created in Cloud1 for a customer. The new
instance must only be created if the sales department manager approves the
request.
Ensure that if an Exchange Server 2010 service unexpectedly stops, a series of
automatic actions is performed to remediate the service failure. The status of each
performed action must be logged in an incident.
Monitor App1 to ensure that client computers in the New York office can connect
to an instance of App1 hosted in the London office. The monitoring solution must
perform tasks that emulate a user accessing App1.
Ensure that database administrators can access alerts, state information, and
performance counters for all of the SQL Server servers in Cloud1 from a

SharePoint webpage.
Ensure that the instances of the App2 hosted in Cloud1 are monitored from a
graphical diagram that displays all of the components of App2.

Automatically create and assign incidents in Service Manager when an alert is
generated in Operations Manager.
Ensure that users can receive alert notifications from Operations Manager as
Microsoft Lync instant messaging (IM) messages.
Monitor the availability of the SharePoint Server 2010 server farm from the New
York office.
Ensure that administrators can undo changes made to the custom rules created in
Operations Manager.
Ensure that help desk users can contact the affected users of an incident by using
IM.
Add the new BizTalk Server server to App1 by using a service template.
QUESTION 1

You need to implement a solution to meet the IM requirements for the help desk users. What should you do?
A. Install Unified Communications Managed API 3.0 Runtime on LON-SM1.
B. Install the Lync 2010 client on LON-SM1.
C. Create a Service Manager workflow.
D. Create an IM channel.
Correct Answer: B QUESTION 2

You need to implement the alert notifications. The solution must meet the technical requirements. A Lync Server administrator enables an account named ADATUM\IMUser for Unified Communications. What should you do next?
A. Configure ADATUM\IMUser as a Run As Account. Install the Lync Management Pack. Create a notification subscriber and an IM channel.
B. Create a mailbox for the ADATUM\IMUser account Install the Exchange Server Management Pack. Create a notification subscriber and an SMTP channel.
C. Create a mailbox for the ADATUM\IMUser account. Install Microsoft Visual C++ 2008 Runtime. Create a notification subscriber and an SMTP channel.
D. Configure ADATUM\IMUser as a Run As Account. Install Unified Communications Managed API 3.0 Runtime. Create a notification subscriber and an IM channel.
Correct Answer: D QUESTION 3

You need to recommend a solution to remediate the Exchange Server 2010 service failures. The solution must meet the technical requirements. What should you include in the recommendation?
A. Create a service request workflow that triggers a dependent activity.
B. Create an incident event workflow that triggers a dependent activity.
C. Create an incident event workflow that triggers a runbook activity.
D. Create a service request workflow that triggers a runbook activity.
Correct Answer: C QUESTION 4

You need to recommend a solution to meet the monitoring requirements for App2.
What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.)

A. An aggregate rollup monitor
B. A distributed application

C. A dependency rollup monitor
D. Service monitors
Correct Answer: B QUESTION 5

You need to recommend a solution to ensure that the sales department managers can create instances of App1 in Cloud1. What should you include in the recommendation?
A. A subscription in App Controller and a task in Service Manager
B. A dashboard in Operations Manager and a distributed application
C. A task in Operations Manager and a distributed application
D. A service offering in Service Manager and a runbook in Orchestrator
Correct Answer: D QUESTION 6

You need to implement a solution to meet the monitoring requirements for App1. Which template should you use?
A. TCP Port

B. Web Application Transaction Monitoring
C. Windows Service
D. Process Monitoring Correct Answer: B QUESTION 7

You need to recommend which Orchestrator integration packs must be deployed to reduce the amount of development effort required to deploy an instance of VMT1.
Which Orchestrator integration packs should you recommend?
A. The System Center Integration Pack for System Center 2012 Virtual Machine Manager and the System Center Integration Pack for System Center 2012 Service Manager
B. The System Center Integration Pack for System Center 2012 Service Manager and the System Center Integration Pack for System Center 2012 Configuration Manager
C. The System Center Integration Pack for System Center 2012 Operations Manager and the System Center Integration Pack for System Center 2012 Service Manager
D. The System Center Integration Pack for System Center 2012 Virtual Machine Manager and the System Center Integration Pack for System Center 2012 Operations Manager
Correct Answer: A QUESTION 8

You need to make changes to the virtual machine template used to deploy web servers for App2. The changes must resolve the NLB issue.
Which setting should you modify for the virtual machine template?
A. Capabilities Profiles
B. Guest OS Profiles
C. Application Profiles
D. Hardware Profiles
Correct Answer: B QUESTION 9

You need to recommend a solution to manage the changes made to the custom rules. The solution must meet the technical requirements. What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.)
A. Export the Operations Manager operational database.
B. Back up the Operations Manager folder.
C. Back up the Operations Manager data warehouse database.
D. Export the custom management packs.
Correct Answer: D QUESTION 10

You need to recommend a solution to meet the monitoring requirements for the database
administrators.
Which components should you recommend deploying in Operations Manager and SharePoint
Server 2010? (To answer, select the appropriate components in the answer area.)
Hot Area:

Correct Answer:

QUESTION 11

You create a virtual machine template for the BizTalk Server server.
You need to recommend a method to update App1. The method must meet the technical
requirements.
Which four actions should you perform in sequence? (To answer, move the appropriate four
actions from the list of actions to the answer area and arrange them in the correct order.)

Select and Place: Correct Answer:

QUESTION 12

You need to implement the planned integration of Configuration Manager and VMM.
You install Configuration Manager and create a collection that includes all of the Hyper-V hosts.
Which four additional actions should you perform in sequence? (To answer, move the
appropriate four actions from the list of actions to the answer area and arrange them in the
correct order.)

Select and Place:
Correct Answer:
Testlet 1

Topic 2, Northwind Traders (A)

Overview

Northwind Traders is a retail company.
The company has offices in North America, Europe, and Asia.
The company plans to implement a private cloud solution that uses System Center 2012 R2.

Existing Environment
Network Infrastructure
Northwind Traders has a single data center that contains an internal network and a perimeter network. The networks are separated by a firewall. The relevant portion of the network is shown in the exhibit. (Click the Exhibit button.)

The networks contain the network devices shown in the following table.

The network contains an Active Directory forest named northwindtraders.com. The forest
contains servers that run either Windows Server 2012 R2, Windows Server 2012, or Windows
Server 2008 R2.
Northwind Traders uses Windows Server Update Services (WSUS) to deploy updates to all of
the servers in the data center. WSUS is installed on a server named NWT-WSUS01.
The network contains as the servers shown in the following table.
Virtualization Infrastructure
Northwind Traders has Hyper-V hosts that run either Windows Server 2012 R2 or Windows Server 2012. The Hyper-V hosts contain virtual machines that are used on the network. The current System Center 2012 infrastructure does not use any cloud settings in VMM.
Application Infrastructure

Northwind Traders develops several web applications by using the Microsoft .NET Framework. The company also hosts a third-party UNIX-based web application on the perimeter network.
Planned Implementation
Network Infrastructure
Northwind Traders plans to upgrade all physical servers to Windows Server 2012 R2.
Northwind Traders also plans to upgrade all of the System Center 2012 components to System
Center 2012 R2 and to deploy all of the System Center components that are not deployed
already.
The company plans to deploy the new System Center 2012 R2 servers shown in the following
table.
NWT-SCOM2 will be deployed to the perimeter network
Virtualization Infrastructure
After the planned deployment of System Center 2012 R2, Northwind Traders plans to move all
virtual machines to four new private clouds named IT, Sales, Finance, and Corporate.
Northwind Traders also plans to virtualize all of the servers that run SharePoint Server 2013.
Northwind Traders plans to provide a runbook-based solution for application developers to create
virtual machines in a test environment.
Northwind Traders also plans to implement a chargeback solution for the virtual machines used
by the IT, Sales, and Finance departments.

Monitoring Solution

After the planned deployment of System Center 2012 R2, Northwind Traders plans to implement the following monitoring solutions:
Generate reports that provide details about the virtual machines, the storage pools,
and the network devices used in the private clouds.
Monitor the availability, CPU usage, and memory usage of all the network
devices in the data center.
Monitor the performance of all the SharePoint servers by using a single
dashboard.

Updates Solution

After the planned deployment of System Center 2012 R2, Northwind Traders plans to manage updates from System Center 2012 R2 and to integrate the existing WSUS server into the System Center 2012 R2 infrastructure.
QUESTION 1

You virtualize all of the SharePoint servers and add them to the Corporate private cloud.
You need to prepare the infrastructure for the planned monitoring of the SharePoint servers.
Which two actions should you perform after NWT-SCOM01 is deployed and NWT-VMM01 is upgraded? Each correct answer presents part of the solution.
A. Import the System Center Management Pack for SharePoint Server 2013 to NWT-SCOM01.
B. Create a new distributed application on NWT-SCOM01.
C. Install the Microsoft Monitoring Agent on the SharePoint virtual servers.
D. Import the System Center Management Pack for SharePoint Server 2013 to NWT-VMM01.
E. Install the Microsoft Monitoring Agent on the visualization hosts.
Correct Answer: ABC
QUESTION 2

You need to recommend a solution to prepare the infrastructure for the planned monitoring implementation.
Which three actions should you recommend performing after NWT-SCOM01 is deployed and NWT-VMM01 is upgraded? Each correct answer presents part of the solution.
A. On NWT-VMM01, configure integration with Operations Manager.
B. On NWT-SCOM01, import all of the management packs that start with Microsoft.SystemCenter.VirtualMachineManager.Storage.
C. On NWT-VMM01, configure integration with WSUS.
D. On NWT-SCOM01, install the Microsoft Monitoring Agent and the Virtual Machine Manager console.
E. On NWT-VMM01, install the Microsoft Monitoring Agent and the Operations Manager console.
Correct Answer: ABE
QUESTION 3

You need to create an object that meets the incident management requirement after all the planned System Center 2012 R2 servers are deployed.
Which type of object should you use?
A. A VMM service template

B. An Orchestrator runbook
C. A Windows PowerShell script
D. A Service Manager workflow
Correct Answer: D QUESTION 4

You need to recommend a solution to monitor the UNIX-based web application. What should you include in the recommendation?
A. The Monitoring Pack for UNIX and Linux Operating Systems
B. A TCP Port monitor

C. A Web Application Transaction Monitor
D. Global Service Monitor
Correct Answer: C QUESTION 5

You need to recommend a management pack template to monitor the web applications that run on the Windows servers. Which management pack template should you recommend?
A. Web Application Transaction Monitoring
B. .NET Application Performance Monitoring
C. TCP Port
D. Process Monitoring
Correct Answer: A QUESTION 6

You need to implement and test the runbook-based solution.
Which tools should you use for each task? To answer, drag the appropriate tools to the correct
tasks. Each tool may be used once, more than once, or not at all. You may need to drag the split
bar between panes or scroll to view content.

Select and Place:
Correct Answer:
QUESTION 7

You need to configure the environment to meet the data protection requirements.
You deploy NWT-DPM01 and configure NWT-DPM01 to back up the SharePoint Server 2013
infrastructure.
You then obtain a certificate for client authentication.
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

Select and Place: Correct Answer:
QUESTION 8

You need to recommend a solution to ensure that price sheets can be created and published after NWT-SCOM01 and NWT-SCSM01 are deployed and NWT-VMM01 is upgraded. On which server should you recommend performing each action? To answer, drag the appropriate servers to the correct actions. Each server may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Select and Place:

Correct Answer: QUESTION 9
You need to prepare the infrastructure to meet the software update requirement.
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

Select and Place:
Correct Answer:
QUESTION 10

You need to identify the minimum number of Operations Manager components required to
implement network device monitoring.
What should you identify? To answer, select the appropriate numbers in the answer area.
Hot Area:
Correct Answer:
Testlet 1

Topic 3, Fabrikam, Inc (A)

Overview

Fabrikam, Inc. is a resale company that has 3,000 employees.
The company has a main office and a branch office. The main office is located in London. The
branch office is located in Montreal. The offices connect to each other by using a WAN link.
Each office connects directly to the Internet.

Existing Environment
Active Directory

The network contains an Active Directory forest named fabrikam.com. The forest contains a single domain. All servers run Windows Server 2012 R2. The main office contains two domain controllers named LON-DC1 and LON-DC2. The branch office contains two domain controllers named MON-DC1 and MON-DC2. Each office is configured as an Active Directory site. The site in London uses an IP address space of 192.168.0.0/17. The site in Montreal uses an IP address space of 192168.128.0/17.
System Center 2012 R2 Infrastructure
Fabrikam has a System Center 2012 R2 infrastructure. The infrastructure is configured as shown in the following table.

LON-OM1, LON-OM2, and MON-GW1 are in the same management group. LON-OM1 and
LON-OM2 have Windows Identity Foundation (WIF) installed.
LON-VMM1 is configured for distributed key management.
The Microsoft Monitoring Agent is installed on 20 servers in the London office and 15 servers in
the Montreal office. The servers in the London office are configured to use LON-OM1 as a
management server. The servers in the Montreal office are configured to use MON-GW1 as a
management server.
Operations Manager is used for server and application monitoring.
Windows Server Update Services (WSUS) is installed on a server named LON-WSUS1.

Applications

You have an application named App1 that is an order tracing application. App1 is written in
unmanaged code.
Customers purchase products on the Fabrikam web site by using a web application named App2.
App2 requires that users be authenticated. The check-out process for purchases has multiple
steps.
You have an application named App3 that is a three-tier accounting application. App3 currently
runs on physical servers.

Incident Management

Users enter incidents in Service Manager. When an incident is created, an incident event workflow is triggered to gather network information.
Requirements
Planned Changes

Fabrikam plans to implement the following changes:
Deploy App3 as a VMM service named Service3

Monitor network devices by using Operations Manager.

Create Operations Manager reports by using Report Builder.

Replace App1 with a new Microsoft .NET Framework application.

Provide users with the ability to select an impact value of All computers for an
incident
Modify the incident event workflow to be triggered when an incident is modified
or created.

Technical Requirements

Fabrikam must meet the following technical requirements:
In the London office, discover only network devices that contain Vendor1 or
Vendor2 in their description.
Monitor the availability of App2 from locations in Europe, North America, and

Flydumps Microsoft 70-981 exam dumps are audited by our certified subject matter experts and published authors for development. Flydumps Microsoft 70-981 exam dumps are one of the highest quality Microsoft 70-981 Q&As in the world.It covers nearly 96% real questions and answers, including the entire testing scope.Flydumps guarantees you pass Microsoft 70-981 exam at first attempt.